Showing posts with label rollout. Show all posts
Showing posts with label rollout. Show all posts

Tuesday, May 31, 2011

Shuttle Atlantis rolls out to launch pad for final time

Shuttle Atlantis inches to her launch pad tonight. (NASA)

Space shuttle Atlantis began her final trip out to her ocean side launch pad tonight in preparation for the final flight of the program's thirty year history.

The roll out began later than planned due to a hydraulic leak on the leveling system on the crawler transport.

Atlantis' first motion occurred at 8:42 p.m. EDT, moving out of the massive Vehicle Assembly Building and out to a large crowd of well wishers as her transport moved at a 1 m.p.h. pace.

Atlantis' four person flight crew were on hand near the assembly building to applaud and smile as their spacecraft slowly began her three mile trek across a gravel and limestone crawler way at the Kennedy Space Center in Florida.

Atlantis' crew of commander Christopher J. Ferguson, pilot Douglas G. Hurley and mission specialists Sandra H. Magnus and Rex J. Walheim will return to Kennedy on June 20 to begin several days of launch pad training, wrapping up with a practice countdown three days later.

Launch of NASA's 135th space shuttle flight is planned for no earlier than July 8 at 11:38:20 a.m., on a two week voyage to the International Space Station.

Since this is the final shuttle flight ever, NASA has worked out plans with Russia in the event the orbiter is damaged during flight and cannot return home.

Atlantis' four person crew would stay aboard the space station and one by one come home with a landing in Kazakhstan during a Soyuz TMA's planned return.

Thus, the four astronauts would land three months after the first lands, and this plan will bring the last crew mate home nearly a year after Atlantis' launch. This is of course a worst case scenario.

Meanwhile, 220 miles above earth Atlantis' sister ship Endeavour is hours away from concluding her final space flight on Wednesday at 2:35 a.m., just as Atlantis is nearing her launch pad.

The space shuttle stack is expected to arrive a top her launch pad at 3:30 a.m. on Wednesday.

Friday, March 11, 2011

Shuttle Endeavour arrives at launch pad for April liftoff

Shuttle Endeavour during sunrise today a top pad 39A. (NASA)

One day after space shuttle Discovery returned home from her final voyage, sister ship Endeavour was moved out to her ocean side launch pad to prepare for her final flight in April.

Shuttle Endeavour left the massive Vehicle Assembly Building last night at 7:56 p.m. EST, to begin the 3 mile trek upon a gravel-covered road out to launch pad 39-A here at the Kennedy Space Center.

Space center employees who worked to prepare the entire space shuttle stack for launch gathered
along with their families in the darkness outside to applaud their work as the pride of America's space program inched away from the assembly building.

"I had never witnessed a roll out before, much less ride on the Mobile Launch Platform! Thousands of people gathered to share in the event," Endeavour pilot Gregory H. Johnson wrote from Kennedy this morning of his upcoming spacecraft.

Moving at 1 m.p.h. a top the mobile launch platform, the tank like treads of the mobile crawler transport delivered Endeavour to a precise point a top launch pad 39-A at 3:49 a.m. this morning.

NASA's newest orbiter is scheduled to lift-off on April 19 at 7:48:40 p.m. to begin her twenty-fifth and final space flight on a two week flight to the International Space Station.

Two days following launch, Endeavour's commander Mark Kelly will guide the orbiter in for a docking at about 4:40 p.m.

The shuttle's six man crew will then get to work to deploy a $1.5 billion particle physics detector on the outside of the space station.

Endeavour's prime payload is the Alpha Magnetic Spectrometer which will be plucked from the aft section of the orbiter's bay by Endeavour's robotic arm and moved out and away. The space station's 58-foot arm will grapple the AMS and place it on the Starboard 3 truss segment's payload attach site.

The spectrometer "will use the unique environment of space to study the universe and its origin by searching for antimatter, dark matter while performing precision measurements of cosmic rays composition and flux," according to AMS scientists.

The AMS is intended to operate through 2020 or longer while scientists from fifty-six institutions in sixteen countries perform their own studies and investigations into the cosmic rays in our galaxy.

Endeavour's all veteran space crew is led by Kelly, includes pilot Johnson, and mission specialists Michael Fincke,
Greg Chamitoff, Andrew Feustel and European Space Agency astronaut Roberto Vittori.

The crew are due arrive on the Space Coast to practice launch pad emergency drills on March 29, and will wrap up their stay with a mock countdown with the launch team on April 1.

Thursday, April 22, 2010

Final Flight: Shuttle Atlantis Moved to Launch Pad

Under the darkness of the Kennedy Space Center, the space shuttle Atlantis was moved out to her ocean side launch pad today in preparation for her final flight.

First motion of Atlantis' mobile launcher platform crawler was set at 11:31 pm EDT, on Wednesday night.

Moving at just under 1 mph, the nearly four mile journey out to launch pad 39-A took just six hours and thirty-two minutes, arriving at 6:03 am today.

Atlantis' journey to her launch pad was twice delayed due to thunderstorms and concerns for lightning in the area. A planned sunrise roll out on Wednesday was scrapped due to the crawler way being too wet, as one technician accessed.

Atlantis' crew of six arrived here at America's Spaceport on Tuesday to perform launch pad emergency drills, and perform a practice countdown on Friday.

The traditional dry-count will see commander Kenneth Ham, pilot Tony Antonelli, and mission specialists Michael Good, Garrett Reisman, Piers Sellers and Steve Bowen climb aboard the orbiter for a simulated engine cut-off.

Atlantis will lift-off on a 12 day mission to the International Space Station, with Russia's Mini-Research Module tucked in her payload bay.

This flight will also mark the thirty-second and final space flight by Atlantis.

Launch of NASA's 132nd space shuttle flight is tentatively scheduled for May 14 at 2:19 pm.

Wednesday, March 03, 2010

Space shuttle Discovery arrives atop Pad 39A

The space shuttle Discovery was moved from her assembly building this morning out to her ocean side launch pad in preparation for her Easter Monday launch with a crew of seven.

The official first motion time for the STS-131 stack as it departed the Vehicle Assembly Building was 11:58 pm EST, on Wednesday evening.

Riding a top the mobile launcher platform at just 1 mph, the six hour, 3.5 mile journey was very quick as the space shuttle traveled through the darkness of a Florida wildlife preserve.

The uneventful trip out to launch complex 39 and pad A occurred under overcast skies, gusty winds and chilly temperatures this morning.

Discovery is currently set to launch on Monday, April 5 at 6:21:17 am EDT, on a resupply mission to the International Space Station. Tucked inside the orbiter's payload bay is the Leonardo module loaded with several tons of supplies and experiments.

The crew will also conduct three spacewalks to retrieve a science experiment and perform maintenance work outside the station.

The flight crew is here at Cape Canaveral this week for launch pad training and a mock practice countdown. They were at the VAB to watch the rollout begin -- the orbiter's first steps toward getting to the space station.

At the helm of Discovery will be commander Alan Poindexter.
The STS-131 crew includes pilot James Dutton, Jr, and mission specialists Rick Mastracchio, Japanese astronaut Naoko Yamazaki, Stephanie Wilson, Dorothy Metcalf-Lindenburger and Clayton Anderson.

Tuesday, February 16, 2010

Next space shuttle launch delayed until April 5

The flight of the next space shuttle mission has been pushed back two weeks due to several weather delays in preparing space shuttle Discovery for the next launch.

Discovery's move from the orbiter processing facility bay to the massive vehicle assembly building has already been delayed several days due to cold temperatures and rain here at the Kennedy Space Center. Rollover is now targeted for this weekend.

Technicians do not want the shuttle exposed to the extra cold temperatures due to it's effect on the 44 steering thrusters which surround the vehicle.

Space shuttle mission managers met this afternoon to approve a new time table for processing Discovery for her thirty-eighth flight.

Launch which had been planned for March 18, is now retargeted for Monday, April 5 at 6:27 am EDT -- the middle of a ten minute launch window.

Once inside the VAB, Discovery will be connected to her rust-colored external tank and rocket boosters a top the mobile launcher platform. The seven hour rollout to launch pad 39-A would then occur one week later.

Discovery new launch date is also based on the launch of a Russian Soyuz TMA with the next expedition crew bound for the space station on April 2.

The Soyuz would then dock on the 4th, allowing Discovery to then later dock on April 7th.

Stay tuned to SpaceLaunchNews.com for new developments on the next space shuttle flight.

Tuesday, October 20, 2009

Ares 1-X rocket gets connected to Pad 39-B

A few great NASA-KSC digital images of the new Ares 1-X rocket at it's launch pad at midday today. The rocket is taller than those flying around the globe today, and stands over 100 feet taller than the space shuttle.


A New White Candlestick Shines on Pad 39-B


After over three years of planning and construction, a brilliant white candle stick shines a top launch pad 39-B at this hour.

Under gray clouds and a brisk wind, the future of America's space flight arrived at it's ocean side launch pad this morning as it prepares for lift-off next week.

The Ares 1-X vehicle a top the mobile launcher platform was officially hard down a top launch pad 39-B at 9:17 am EDT today. Over the next few hours, pad technicians worked to connect the rocket to power sources and connect a stabilization collar near the upper mid section. Upcoming at about 12:40 pm, the rotating service structure will be moved around the rocket as it helps provide weather protection and access to avionics sections, too.

The candlestick's 4.2 mile slow trek from the massive Vehicle Assembly Building out to Pad 39-B was the first time a non-space shuttle stack has occupied the pad. Launch pad 39-B has launched such notable flights as the Apollo 10 lunar orbital flight; Apollo 18 which linked up with the Russian Soyuz in 1975; and the ill-fated Challenger launch in 1986.

Launch of the Arex 1-X remains set for this Tuesday morning, October 27, at 8AM EDT. If lift-off is scrubbed, NASA's Kennedy Space Center launch team have both Oct. 28 and 29th booked on the eastern test range.

Future of American Human Spaceflight Debuts


The future of the American human space flight program debuted early this morning as a new, white 327-foot rocket began it's roll out to the launch pad to prepare for a new decade of space travel.

First motion of the crawler transport carrying the Ares 1-X rocket began at 1:39 am EDT, this morning -- 98 minutes later than planned due to this being the first rollout of this new rocket.

The 1.8 million pound rocket inched at a slow rate as it traveled the 4.2 miles from high bay 3 in the massive Vehicle Assembly Building out to launch pad 39-B this morning.

On Thursday, the Ares 1-X launch team in firing room 1 will run through a practice countdown in preparation for the launch test.

The Ares 1-X launch is set for 8AM EDT on Tuesday, October 27th. The launch window will last four hours.

After Ares 1-X clears the tower six seconds following launch, it will head east and fly up to 28 miles before separating it's first stage booster rocket some 244 statue miles down range.

The future of the new Constellation program calls for the next unmanned flight, Ares 1-Y, in 2014, and a third test flight called Orion 1 which will see the module achieve orbit shortly after 1-Y's success.

Thursday, October 15, 2009

NASA ARES 1X rocket to rollout on Tuesday

The future of America's human space flight will take it's first baby steps on Tuesday morning as NASA sends out to the launch pad a new rocket designed to replace the space shuttle fleet in the coming years ahead.

The Ares 1X rocket test launch will be the first step in the beginning of the Constellation program which will consist of both Ares 1 and Ares 5 rockets transporting Americans and her space partners to the International Space Station and beyond.

Rollout from high bay 3 of the Vehicle Assembly Building at the Kennedy Space Center is scheduled to begin one minute after midnight this Tuesday morning as it rides a top Mobile Launcher Platform #1. Approximately 7 hours later, the MLP should arrive at launch pad 39-B following it's slow crawl over four miles.

Rollout was originally planned for this Monday, but
"During testing late on October 14, hydraulics engineers detected a gaseous nitrogen leak in the accumulator which is located in the aft skirt of the rocket. The pressurized nitrogen is leaking past a seal and into the area of the accumulator containing hydraulic fluid. The accumulator absorbs hydraulic pressure spikes as the system operates. The accumulator (was) removed and replaced today," according to Kennedy Space Center officials.

Pad 39-B has supported space shuttle launches since 1986 and was recently decommissioned to begin supporting the Ares program.

Launch of the new Ares is scheduled for October 27th at 8AM EDT - the launch window is four hours and is dictated by workers rest. Much like the first space shuttle launch, the launch team will be working through an entirely new launch countdown procedure book and the computers will be checking to ensure is item is completed before it commits to launch.

Once launched, technicians here at Kennedy will collect data on several key points:
  • The way the Ares 1 leaves the pad and rolls
  • How the Ares handles under staging
  • Aerodynamic loads as it reaches Mach 1 and beyond and the stress loads of 2.5 G's
  • and dummy capsule return
Once Ares 1X launches from pad 39-B, it will generate 2.6 million pounds of thrust as it rises to begin a new era of space flight, that is if the Obama administration elects to keep Ares.

The Ares first stage will separate at an altitude of 130,000 feet out over the Atlantic Ocean, however due to it's forward velocity of Mach 4.7, the Ares will travel up to around 150,000 feet before falling back.

SpaceLaunchNews.com will have LIVE video coverage of the unmanned flight beginning at 7AM EDT on launch day. Follow us via Twitter @spacelaunchnews.

Wednesday, October 14, 2009

Space shuttle Atlantis departs for Launch Pad


NASA and launch teams here at the Kennedy Space Center are spending today moving the space shuttle Atlantis out to her ocean side launch pad in preparation for her journey into space next month.

Riding a top Mobile Launcher Platform #3, Atlantis departed the massive Vehicle Assembly Building to begin her 3.4 mile trip out to launch pad 39-A at 6:38 am EDT this morning -- a bit later than planned due to light rain.

The MLP moves at a top speed of 1 mph with a space shuttle stack a top it as it rolls along it's own private road made up of multiple layers of bedrock and stone. At all times the MLP has to keep it's top surface level, thus when it approaches an incline, it will raise either end to match a level area.

At 8AM, the MLP stopped for five minutes due to an area of concern which turned out to be nothing.

Atlantis is scheduled to depart KSC bound for the International Space Station on November 12 on a resupply flight.

Tuesday, August 04, 2009

KSC Images from Discovery Rollout Today


The space shuttle Discovery made it to her ocean side launch pad today, following a late start and a muddy trip caused by thunderstorms over the Kennedy Space Center last night.

Discovery, which is slated to liftoff on a space station resupply mission on August 25, was hard down on launch pad 39-A at 1:50 pm EDT, this afternoon. The following NASA-KSC images show a beautiful white dove ready to continue America's focus of the future of humankind.


Discovery Rollout Underway following Delay


Thunderstorms and lightning over the Kennedy Space Center this morning forced a two hour delay in the start of the roll out of the space shuttle Discovery to her ocean side launch pad, however muddy bedrock is slowing the ships progress.

Riding atop a massive mobile launcher platform a fixed to a crawler transport, the space shuttle stack for the upcoming STS-128 mission officially left the vehicle assembly building at 2:07 am EDT, this morning to begin its 3.5 mile journey to launch pad 39-A.

The multi-tread crawler has had to make a few stops early on due to thick mud and rock collecting within and outside of the tread. So technicians have had to clear the limestone rock and mud so that the tracks are not impacted from ease of movement.

The mobile launcher platform crawler weighs 8.8 million pounds alone; and 11 million pounds with the empty space shuttle Discovery riding a top this morning.

The transporter, according to officials here at Kennedy, "travels on eight tracked tread belts, each containing 57 tread belt "shoes". Each shoe is 7 1/2-feet long and weighs 2100 pounds." New shoes were installed in late-2004, replacing worn and cracked shoes.

The crawler way, which runs from the vehicle assembly building out to the launch pad, is 130 feet wide with river gravel about four inches thick on the straight away lanes. The rock measures 8 inches deep along the curves of the crawler way. Below this is another 7.5 feet of crushed stone and dirt which were compressed as the layers were built up.

Discovery is currently targeted for launch on August 25th, at 1:36 am EDT.

Wednesday, July 29, 2009

NASA prepares Discovery for August Launch

Running a few weeks behind schedule due to the delays of the recent Endeavour mission, the space shuttle Discovery is expected to depart the Kennedy Space Center's vehicle assembly building for her launch pad on Monday.

Riding a top a huge mobile launcher platform, the STS-128 space shuttle stack is expected to begin its first motion just after midnight on August 3. Approximately eight hours later, the transport is expected to be at Launch Pad 39-A as crews prepare Discovery for her late-August flight.

Moving at just 1 mph the entire three and one-half miles, the space shuttle crawls so slow so that vibration from speed does not cause the stack to move. As the crawler approaches the ramp up to the pad, the flat top of the platform remains level as hydraulic jacks rise and lower to keep the space shuttle level at her base.

Two days following roll out, the seven member crew of Discovery's STS-128 mission will arrive here at Kennedy for three days of launch pad drills and safety checks. Crew arrival is expected this Wednesday afternoon.

Launch of Discovery is expected for no earlier than August 25th -- a few days shy of the 25th anniversary of her first flight into space on STS-41D.

Inside the orbiter's payload bay will be the Leonardo Module, which will host a wealth of supplies, food, fuel and more for the six-person crew aboard the international space station.

Also inside Leonardo (one of two reusable Italian-built supply modules) will be the COLBERT or Combined Operational Load-Bearing External Resistance Treadmill. The COLBERT was named for the Comedy Central host Stephen Colbert, and will be built and used aboard the station for crew exercise.

Friday, April 17, 2009

Endeavour Rollout Images from this Morning

8:15 am EDT: Endeavour under a blue sky at pad 39-B with the GO2 vent hood parked over the Tank in this updated image via NASA-TV.
Endeavour is shown in several NASA-TV still shots as she inched closer to the top of launch pad 39-B this morning between 6:30 and 7:01 am EDT.


Monday, March 30, 2009

Atlantis to Rollout to Launch Pad Tuesday

As the cool dew lays cover on the predawn of Tuesday morning, in the middle of a swamp field on the shores of the Atlantic Ocean the world's first reusable space vehicle will move from its assembly building to her launch pad to prepare for a return to earth orbit.

The space shuttle Atlantis will begin her 3.5 mile journey to launch complex 39 and pad A at 4:01 am EDT tomorrow.

Atlantis is currently scheduled to launch on a return servicing mission to the Hubble Space Telescope on May 12th. This will be the final flight to both repair and upgrade Hubble which was launch aboard Discovery in April 1990. This mission will hopefully extend Hubble's life through 2014.

Wednesday, January 14, 2009

Discovery STS-119 Rollout Images



A few great images we just received from KSC /NASA PAO this afternoon. Discovery arrived at her seaside launch pad 39-A at 12:15 PM EST today.
 
copyright 1998 - 2010 Charles Atkeison, SpaceLaunchNews.com. All rights reserved.